9.1 General
Set the app display name, risk ID prefix (default RISK-2026-), and program manager. Existing risks keep the ID they were assigned when created.
9.2 Language
Choose the default language. Users can also switch from the header: English, Spanish, French, and German.
9.3 Appearance
Upload a wide header logo and an optional mini logo for the collapsed sidebar. When a wide logo is set, it replaces the app name in the top bar (the name remains in titles and accessibility labels).
9.4 Forms and templates
Customize risk forms and reusable form templates so different risk types collect the fields you need.
9.5 Notifications and email
Edit email templates for new, assigned, and updated risks. Tokens such as risk ID and title are replaced at send time. Email requires approved Graph Mail.Send.
9.6 Security
Manage administrators, roles (Admin, Risk Manager, User), permissions, and user assignments so owners see their own work while managers see the register.
9.7 License and migrate
Activate the site-collection license after the trial. Use Migrate when moving data from an older Chronodat Risk Matrix (Pro) installation or an Excel workbook.